Back
Northvale Paper Mill
Live Operations Dashboard
Messages: 0 / 17
Comms LogLive
Waiting for communications...
ERP — Production Schedule
Shift Output:127.3 / 180 tons(71%)
Grade change: 16:30
Current Reel: R-120412.4 tons (building)
| Order | Customer | Grade | Width | Target | Status |
|---|---|---|---|---|---|
| PO-2847 | Greenfield Retail | LWC 60gsm | 2400mm | 45t | 🟢 |
| PO-2848 | Metro Print Co | SC-A 52gsm | 2200mm | 32t | ⏳ |
| PO-2849 | Atlantic Packaging | Board 250gsm | 1800mm | 28t | ⏳ |
IoT Telemetry — Paper Machine 23 warnings
Machine Status: Running (Reduced)Updated: 14:28:18
Former
⚠️Machine Speed
876 m/min
Target: 920
✅Headbox Pressure
2.4 bar
2.2-2.6
Press
✅Nip Load
85 kN/m
80-95
Dryer Section
⚠️Steam Pressure
3.1 bar
Target: 3.8
⚠️Cylinder Temp D4
94°C
Target: 115
Coating
✅Blade Pressure
1.8 bar
1.5-2.0
Reel
✅Web Tension
4.2 kN
3.8-4.5
✅Roll Diameter
1.85 m
Max: 2.2
Quality
✅Moisture
5.8%
5.5-6.5
✅Caliper
61 µm
60±2
Fulcrum AIConnected: Comms, ERP, IoT
Ask me about the mill operations. I can query communications, ERP data, and IoT sensors to give you unified insights.